
{"id":426,"date":"2026-05-10T06:50:05","date_gmt":"2026-05-10T06:50:05","guid":{"rendered":"https:\/\/dailypakistannews.com\/?p=426"},"modified":"2026-05-10T06:50:05","modified_gmt":"2026-05-10T06:50:05","slug":"gas-supply-suspended-in-karachi-after-pipeline-damaged-in-red-line-construction","status":"publish","type":"post","link":"https:\/\/dailypakistannews.com\/?p=426","title":{"rendered":"Gas supply suspended in Karachi after pipeline damaged in Red Line construction"},"content":{"rendered":"<p>KARACHI: Gas supply was disrupted in major parts of the city on Saturday evening after the Red Line construction work damaged a high-pressure gas pipeline near Jail Chowrangi.<\/p>\n<p>A spokesperson for the Sui Southern Gas Company (SSGC) said that a12-inch diameter high-pressure pipeline was hit during excavation for the bus rapid transit (BRT) project.<\/p>\n<p>The spokesperson said as a result the gas supply to Saddar, Garden, Jamshed Road, PIB Colony, Lyari, Lines Area and adjacent localities was immediately suspended.<\/p>\n<p>She said that the SSGC teams reached the site and cordoned off the damaged section of the supply line with safety barriers to prevent further risk.<\/p>\n<p>Residents in affected areas reported complete disconnection of gas at 7pm, adversely impacting mainly households, who relied on piped gas during peak cooking hours in the evening.<\/p>\n<p>The spokesperson said that repair work was being carried out on an emergency basis. \u201cGas supply will be restored gradually once repair work is completed,\u201d she added.<\/p>\n<p>The spokesperson that the repair work was expected to be completed early Sunday morning and supply would be phased back as repaired were completed.<\/p>\n<p>The BRT construction corridor in Karachi has seen multiple utility line strikes in recent months as underground infrastructure intersects with ongoing roadworks.<\/p>\n<p><em>Published in Dawn, May 10th, 2026<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>KARACHI: Gas supply was disrupted in major parts of the city on Saturday evening after the Red Line construction work damaged a high-pressure gas pipeline near Jail Chowrangi. A spokesperson for the Sui Southern Gas Company (SSGC) said that a12-inch diameter high-pressure pipeline was hit during excavation for the bus rapid transit (BRT) project. The [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":427,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-426","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pakistan-news"],"_links":{"self":[{"href":"https:\/\/dailypakistannews.com\/index.php?rest_route=\/wp\/v2\/posts\/426","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dailypakistannews.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dailypakistannews.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/dailypakistannews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=426"}],"version-history":[{"count":0,"href":"https:\/\/dailypakistannews.com\/index.php?rest_route=\/wp\/v2\/posts\/426\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dailypakistannews.com\/index.php?rest_route=\/wp\/v2\/media\/427"}],"wp:attachment":[{"href":"https:\/\/dailypakistannews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=426"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dailypakistannews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=426"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dailypakistannews.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=426"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}